Magazine zum Globus AG Case Study

A full IT carve out without slowing the business

After the separation from the Migros Group, Globus needed to move critical IT services into a new operating environment. Allgeier migrated 95 IT services, including workplace, M365, Azure Cloud, DNS and network services, while day to day operations continued as usual.

In

18

months full IT independence under high time pressure was achieved.

95

IT services migrated into the new operating environment.

"Our collaboration with our colleagues at Allgeier was constructive and always characterized by a positive attitude."

Professional headshot of Giovanni Odoni in a black suit and white shirt

Giovanni Odoni

Director IT Business Solutions, Magazine zum Globus AG

Business consultants discussing retail service strategy inside a Globus store
Purple quotation mark graphic used as a decorative testimonial design element

Real case

Separation
without disruption

User disruption risk

Employees had to keep working while workplaces, access, and services moved into a new environment.

Critical service separation

Globus needed to separate 95 IT services from the previous group setup without losing operational control.

Cloud and network dependency

Azure Cloud, DNS, M365, and network services were part of the wider migration scope.

Tight timeline

The transition had to be completed in 18 months under high time pressure.

Cost pressure

The new setup also had to support a more flexible and optimized cost structure.

Our point of view

Built around responsibility.

Proven by outcomes.

1

Plan migration
A dedicated concept reduced risk and kept operations stable.

2

Migrate services
Applications, workplaces, and services moved into the new setup.

3

Secure access
Tenant cutover retained logins and permissions.

4

Standardize workplace
New devices followed a standard configuration with kiosk options.

5

Stabilize operations
The new setup went live with only a small number of incidents.

The Transformation

From shared IT dependency to
independent operations

Speak with an expert

Every inquiry reaches the right specialist.

Abstract purple wave background for modern technology and digital transformation design

Sales Americas

Abstract purple wave background for modern technology and digital transformation design

Sales EMEA

Abstract purple wave background for modern technology and digital transformation design

Sales APAC

Request a meeting

Tell us your challenge — right expert within 24h.

GDPR compliant. Data never shared.

Request a meeting

Tell us your challenge — right expert within 24h.

GDPR compliant. Data never shared.

FAQ

Questions enterprise leaders ask before they commit.

The goal was to separate Globus from shared IT services after the carve out and move workplaces, M365 online services, and selected infrastructure topics into a new independent setup.
The project ran for 18 months and resulted in full IT independence for Globus.
The project included the migration of workplaces, M365 online services, applications, and other IT services into the new environment.
Applications and services were migrated as is first, then optimized later. Logins and permissions were retained while devices and provisioning were renewed.
The project involved M365, Azure Cloud, Active Directory migration, tenant cutover, DNS, and selected network services.
Business continued as usual during the transition. The new infrastructure and workplace setup are running smoothly, with only a small number of incidents.